index 61685a91a9ab922bd333505ad208c80ef2cdad20..17c8b762ad0f0dbf9986e9f90993d2add84fdd44 100755 (executable)
Binary files a/data.db and b/data.db differ
+ "title": "Kit picked up from the MediaCity kit store",
"extra": [
- "Meet in room 3.08 MediacityUK campus",
- "Setup to be completed for 1200",
- "Set-design team to prepare stand-in products"
- ]
+ "To be picked up by the vision mixer unless otherwise specified.",
+ "Kit is: Cannon C200 (2), Manfrotto 501 tripod (2), Zoom F6 (1), Radio mic (3)"
+ ]
},
{
- "time": "1200",
- "title": "Crew call time (Room 3.08) for meeting with producer",
- "extra": []
+ "time": "1000",
+ "title": "All crew moves to Studio A",
+ "extra": [
+ "Vision mixer, Engineer, Sound, Output monitor and dedicated GFX operators to gallery to setup the cameras and sound kit as instructed by producer in advance.",
+ "All other personnel to the floor to setup the set. Floor plan is present on the digital docs, both FMs and the Set design lead will have tablets to access this, but the link will work on any device.",
+ "Lighting to setup and test lighting.",
+ "As soon as set complete: technical test on all kit including THE THREAT, the Lazy-Susan, the Doomsday Clock, the GFX system and the sound system.",
+ "Gallery crew should start technical test of the GFX system and the sound system at the instruction of the Narrative Engineer if the producer is still on the floor.",
+ "Set-design team begin bringing down the products from room 3.08 at the direction of set design lead"
+ ]
},
{
- "time": "1245",
- "title": "Crew break until 1315",
- "extra": []
+ "time": "1030",
+ "title": "Crew 15 minute break",
+ "extra": [
+ ]
+ },
+ {
+ "time": "1045",
+ "title": "Crew arrive back on set: begin run-throughs of the end",
+ "extra": [
+ "Call time for photographer",
+ "Full crew run-throughs until happy with the order of operations",
+ "Should include THE THREAT, so The Anchor must not be present.",
+ "See production notes document for more details"
+ ]
},
{
- "time": "1300",
- "title": "Cast call time to room 3.08 for briefing.",
+ "time": "1100",
+ "title": "Anchor arrives, is met by set-design lead in room 3.08 for costuming.",
"extra": []
},
{
- "time": "1315",
- "title": "Practice begins",
+ "time": "1130",
+ "title": "Prepare for Anchor on the floor",
+ "extra": [
+ "Crew take position for short practice"
+ ]
+ },
+ {
+ "time": "1145",
+ "title": "Practices begin at the direction of the producer",
+ "extra": [
+ "This will be practices of product hand-over with the FMs as well as individual products where necessary."
+ ]
+ },
+ {
+ "time": "1200",
+ "title": "The Backup Anchor arrives, is met by set-design lead and producer in the foyer and taken to room 3.08 for costuming and short brief on timings.",
"extra": [
- "Final full overview of responsibilities",
- "Moving onto smaller run-throughs and trying new techniques"
- ]
+ "This will be practices of product hand-over with the FMs as well as individual products where necessary.",
+ "After backup is costumed, to be taken to the green room."
+ ]
+ },
+ {
+ "time": "1215",
+ "title": "All crew and cast prepare for full run-through",
+ "extra": []
},
{
- "time": "1400",
- "title": "Cast 15 minute break",
+ "time": "1230",
+ "title": "Stream goes live and full run-through begins (latest 1245 for 1h runtime)",
"extra": [
- "Some crew may also be dissmissed for a break",
- "Producer chat before run-through"
- ]
+ "Backup anchor to be ready to step in for their product when prompted by the FMs"
+ ]
},
{
- "time": "1430",
- "title": "Begin run-through",
- "extra": ["All crew (other than directors and Anchor) dismissed as soon as finished."]
+ "time": "1345",
+ "title": "Last possible time a stream can be started with 30 minute runtime (contingency)",
+ "extra": []
},
{
- "time": "1530",
- "title": "Kit returned to store",
+ "time": "1330",
+ "title": "Stream ends",
"extra": [
- "Anchor dismissed.",
- "Producer and Directors meeting till dismissed"
- ]
+ "All crew to the floor for strike",
+ "When set is de-rigged, all available cast and crew to 3.08 for final words."
+ ]
}
],
"notes": [
- "Note that this is a practice session, nothing forbidden is practiced or revealed.",
- "Small test runs of small GFX features (e.g. Multiple simultaneous timers)",
- "Run through at least 25 minutes of continuous teleshopping (Recorded).",
- "Particularly looking for feedback on: new sound system, new feature text, new sigil visuals, new GFX control layout",
- "Additional notes on further features ahead of the next practice session."
+ "Sioux Sharp (S.Sharp3@salford.ac.uk) and Joe Fowler (J.A.R.Fowler2@salford.ac.uk) will also be in attendance in the gallery, on the floor, or in the green room. To be confirmed with them.",
+ "Lucas Blackburn's presence (the backup) is to be kept secret from the Anchor, his entrance to the studio is to be facilitated by the cyclorama blocking the Anchors view of the door."